The CM Punjab Solar Panel Scheme July Updates – Online Apply announcement has brought a fresh wave of relief for low-income households across the province. Under the Roshan Gharana Program, Chief Minister Maryam Nawaz Sharif’s government aims to provide free solar panel systems to families using 50 to 300 electricity units per month. This initiative aligns with Punjab’s green energy drive to shift power consumption from traditional sources to renewable solar energy.
In this article, we’ll explain the complete application process, eligibility criteria, registration method, benefits, deadlines, and all the latest July 2025 solar panel scheme updates. If you’re a resident of Punjab and looking to apply for subsidized or free solar panel systems, this guide is for you.
Overview of the Punjab Roshan Gharana Solar Scheme
The Punjab Solar Panel Scheme 2025 falls under the Roshan Gharana Initiative, launched to combat rising electricity bills and promote clean energy. As of July 2025, the scheme has entered its second phase, focusing on expanding access and accelerating installations for approved households.
Objectives:
Reduce electricity bills for poor and lower-middle-class families
Encourage use of solar power systems for homes
Promote environmental sustainability
Minimize load shedding and pressure on the national grid
Eligibility Criteria for CM Punjab Solar Panel Scheme 2025
To apply for the scheme, you must fulfill the following eligibility requirements:
Eligibility Factor | Criteria |
---|---|
Residency | Permanent resident of Punjab |
Monthly Electricity Usage | 50 to 300 units per month (average of last 6 months) |
Income Level | Low-income or deserving families, verified via CNIC data |
Electricity Bill Status | Must not have unpaid dues or illegal connections |
Property Ownership | Home must be owned or permission must be granted by owner |
CNIC Requirement | Must possess a valid NADRA-issued CNIC |
Note: Priority will be given to those consuming up to 100 units per month as part of the first phase of installations.
What’s Included in the Solar Panel Package?
Each qualified household will receive a complete solar setup, which includes:
Component | Details |
---|---|
Solar Panels | 1kW to 3kW panels based on electricity usage |
Inverter | Modern inverter with voltage regulation |
Batteries | 2x high-capacity batteries for nighttime use |
Wiring & Installation | Complete wiring with safety compliance |
Net Metering Option | Available for higher-consumption households (Phase 2 only) |
Warranty | 5-year warranty on panels and inverters |
How to Apply for CM Punjab Solar Panel Scheme Online
The online registration process has been made simple through the Punjab Roshan Gharana Web Portal. Here’s a step-by-step guide to help you apply:
Step 1: Visit the Official Portal
Go to the official Roshan Gharana Scheme registration website (usually found via punjab.gov.pk or newly launched solar portal links).
Step 2: Create an Account
Sign up using your CNIC number, mobile number, and email ID. A verification OTP will be sent to your phone.
Step 3: Fill Out the Application Form
Enter household details
Upload latest electricity bill (last 3 months)
Upload a scanned copy of your CNIC (front and back)
Mention your monthly electricity consumption
Provide ownership proof or NOC
Step 4: Submit and Await SMS Confirmation
Once your application is submitted, you’ll receive an SMS confirmation. The verification and shortlisting process may take 2–3 weeks.
Offline Registration – Bank of Punjab (BOP)
If you don’t have internet access, you can register manually at the nearest Bank of Punjab (BOP) branch. Bring the following documents:
Original and copy of CNIC
Electricity bill (last 3 months)
Home ownership proof or permission letter
Filled paper application form (available at BOP)
July 2025 Updates on CM Punjab Solar Scheme
The July 2025 updates introduced key enhancements to the scheme:
✅ 10,000 new households added to the Phase 2 beneficiary list
✅ Priority now given to families consuming 100–300 units
✅ Women-headed households to get dedicated quota
✅ Faster installation timelines (within 15–20 days post-verification)
✅ Launch of mobile registration vans for remote areas
The government has also announced a Rs. 12 billion subsidy to support more families under this solar initiative.
Benefits of the CM Punjab Solar Panel Scheme
1. Cost Reduction
Households can save Rs. 3,000 to Rs. 6,000 per month depending on consumption.
2. Reliable Power
With battery backup, homes enjoy uninterrupted electricity, even during outages.
3. Environmental Impact
Each solar unit helps reduce carbon footprint and supports climate-friendly goals.
4. Empowering Women
Special quotas for widows and women-led households encourage energy independence.
Application Tracking and Approval Status
After submission, you can track your application status via:
Online Portal: Log in using CNIC and view real-time status
SMS Tracking: Send your CNIC number to a designated SMS code (e.g., 8800)
Helpline: Call the dedicated Roshan Gharana Helpline at 042-111-267-200
Estimated Installation Timeline
Phase | Electricity Use | Install Date |
---|---|---|
Phase 1 | 50–100 units/month | Ongoing (since May 2025) |
Phase 2 | 101–300 units/month | July–August 2025 |
Phase 3 | 300+ units (paid plan) | Planned for Oct–Dec 2025 |
Important Documents Required
Make sure you have the following before applying:
Copy of CNIC (applicant and family head)
Latest 3 months electricity bills
Home ownership or NOC from landlord
Recent photo (passport size)
Mobile number linked to CNIC
Who Gets Priority in Selection?
The following households will be shortlisted first:
Electricity usage under 100 units
Widows and women-led families
Disabled or senior citizen applicants
Remote/rural areas without grid connection
Regular electricity bill payers
Summary of CM Punjab Solar Scheme (July 2025)
Feature | Details |
---|---|
Scheme Name | CM Punjab Roshan Gharana Solar Panel Scheme |
Phase | Phase 2 (July 2025 Updates) |
Units Covered | 50 to 300 units/month |
Target Audience | Poor & middle-class households |
Application Mode | Online via portal or Offline via BOP |
Documents Required | CNIC, electricity bill, ownership proof |
Priority Criteria | Widows, low units, women-led homes |
Subsidy | Rs. 12 billion announced |
Panel Capacity | 1kW to 3kW setups based on use |
Installation Deadline | Within 15–20 days after approval |
FAQs: Punjab Solar Panel Scheme July 2025
Q1: Who is eligible for the CM Punjab Solar Panel Scheme?
Households using 50 to 300 electricity units per month and residing in Punjab are eligible. Special preference is given to widows, low-income families, and rural areas.
Q2: Is there any cost to install the solar panels?
No, for eligible low-consumption families, the system is free. Partial subsidies may apply to those above 300 units/month.
Q3: How long does it take after applying?
Verification and shortlisting can take 2–3 weeks. Installations are completed within 15–20 days post-approval.
Q4: Can I apply if I live in a rented home?
Yes, but you’ll need written permission from the homeowner and utility bill in your name.
Q5: Is the solar panel scheme only for residential homes?
Yes, the current phase is strictly for residential electricity consumers in Punjab.
Q6: How will I know if my application is approved?
You’ll receive an SMS update and can also track your status online using your CNIC.
Q7: Are battery backups included?
Yes, battery backup systems are provided to support night-time and load-shedding usage.
Final Thoughts
The CM Punjab Solar Panel Scheme July Updates – Online Apply initiative is a vital step toward energy independence and affordability for Punjab’s citizens. With easy registration options, solid government backing, and clear eligibility, now is the time to apply. Whether you’re looking to lower your power bills or embrace sustainable living, this scheme can bring life-changing benefits.
Stay updated via the Roshan Gharana portal and ensure you meet the eligibility and documentation requirements to secure your free solar setup.
Apply kesy kren kesy milyga solar penal